Service

Construction of houses, villas and apartment buildings

We build new residential projects from the foundations to the final finishes, with engineering supervision at every stage and a budget you can follow line by line.

Contemporary private residence built in Greece by ERGA Construction

What the construction of a residence includes

Construction starts long before the first excavation. We review the design, check the technical file, plan the site organisation and confirm the programme and cost per work package.

From that point, each stage is executed and verified before the next one begins, which keeps quality issues from being buried inside the structure.

  • Excavation, foundations and reinforced concrete structure
  • Masonry, thermal insulation and waterproofing
  • Windows, doors and building envelope
  • Electrical, plumbing, heating and cooling installations
  • Floors, bathrooms, kitchens and finishes
  • External works, fencing and utility connections

Luxury villas

Villas demand more from both design and execution: large openings, cantilevers, pools, terraces and exposed materials leave no room for approximate detailing.

We pay particular attention to waterproofing, thermal bridges, drainage and the junctions between stone, concrete and glass — the details that determine how the building ages.

Apartment buildings and investment projects

For residential developments we work with a construction logic focused on the final product: efficient layouts, sound and thermal performance, and specifications that hold their value.

Cost control here is not about the cheapest material but about avoiding rework and delays.

Quality control and handover

Before handover we run a full inspection: installations tested, surfaces checked, and a snag list closed out in writing.

You receive the technical documentation of the building, warranties for equipment and clear instructions for maintenance.

Frequently asked questions

Do you build outside Athens?
Yes. Besides Athens and Attica, we build houses and villas in Mani and the wider Peloponnese, where a large part of our residential work takes place.
How long does a house take to build?
For a typical 150–250 sqm residence, construction usually takes 12 to 18 months after the permit is issued, depending on the site, the structure and the specification level.
Can you work with my own architect?
Yes. We frequently build designs prepared by external architects and take on construction, coordination and site management from that point onwards.

Discuss your project with us

Send us the basics about the property and the project and we will come back with a proposal and a cost estimate.